eval limited run period

eval limited run period

admin asked 11 years ago
Hi, I haven’t found this written anywhere, is the evaluation version stopping after a certain time period? I wanted to leave the server overnight to test something and I’ve found it stopped this morning. It stopped gracefully (log sais /applications/lminterface/src/application/lminterfaceapplication.cpp:112:SignalApplicationMessage:Gracefully shutdown) a few hours after I left the office. Thanks.



Offcanvas

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.